The development of crane technology

1898The first large electric gantry crane is built. It has a lifting capacity of 12.5 t and 11.5 m span.
1964 The first complete standardised crane programme is developed. Typification and standardisation permit efficent production at a high level of quality.
1984Introduction of the KT 2000 small crane system. This sophisticated modular system of rails, hoists, travel units, etc. can be employed flexibly both for simple applications and for automated material flow solutions.
1991Capacity of Ettlingen crane factory doubled by means of innovative process technology.
2006The beginning of a new era: innovative crane technology with practical conductor line, i. e. with no moving cables, is presented and launched on the market.
2010The new concept CraneKits for Crane Builders keeps planning work at a reasonable level and makes processing of orders effective and economical.
2013Introduction of KS and KA light crane systems.

更多展信息

1954 年位于斯图加特的 R. STAHL Maschinenfabrik – Aufzugbau(电梯制造机械厂)大楼前的公司汽车。

公司

公司的起步和发展。

 公司

1903 年,R. STAHL 在其产品系列内增加了电动葫芦的制造。

环链葫芦

环链葫芦发展历程。

 环链葫芦

引领潮流的创新,1922 年,开发了 SS 型电动钢丝绳葫芦。现在,也可以达到很高的起升高度和很快的速度。

钢丝绳葫芦

钢丝绳葫芦的发展。

 钢丝绳葫芦

1953 年由德国联邦物理技术研究院批准:第一台具有防爆、隔爆封装控制系统的防爆、隔爆封装电动钢丝绳葫芦。

防爆保护

防爆葫芦和起重机部件发展历程。

 防爆保护

第一部帕特诺斯特电梯安装在斯图加特的 15 层 Graf-Eberhard 大楼中。它是世界上最高的帕特诺斯特电梯。

定制工程解决方案

我公司历史中重要的非标解决方案。

 定制工程解决方案