Go to global navigation, to local navigation, to the content, to additional information

customer: Elsam Kraft A/S, Esbjerg/Dänemark
Constantly rising global energy requirements and new statutory regulations are the main impetus for business in modern power station technology – a challenge for manufacturers: they must design power generating plants that are reliable and environment-friendly. In addition, low investment costs and a high degree of economic efficiency are required.
| Project data | |
|---|---|
| Participating companies: | Fisia Babcock, Elsam Engineering A/S, R. STAHL Fördertechnik GmbH |
| Scope of supply: | SH 6025-20 2/2-2 L5 L5 wire rope hoist with monorail trolley |
| S.W.L.: | 2.500 kg |
| Height of lift: | 75 m |
| Hoisting speed: | 3,3/20 m/min |
| Duty cycle: | 20/65%ED |
| Equipment: | off-standard rope drive with true vertical lift, electronic motor management, overload sensor in gear, motor temperature control |
© STAHL CraneSystems GmbH 2007 | | About this Site | Privacy Statement | Index | Sitemap