customer: Lütkenhaus, Dülmen
Precast concrete parts are high technology. They have to bear heavy loads, span wide areas and last for decades. In addition, they must translate into reality the frequently complicated concepts of architects while remaining economical. However, their manufacture too demands extreme precision and the most up-to-date technology.
| Project data | |
|---|---|
| Order processed: | October to December 2001 |
| Hoists: | 4 electric wire rope hoists, type AS 7050-38, each 21.5 t S.W.L. |
| Mechanism group: | 3m to FEM |
| Effective load: | 50 t |
| Hoist motor: | 36 kW at 80% DC – frequency-controlled |
| Load rope: | 4-fall, Ø 25mm |
| Hoisting speed: | max. 15 m/min (load-dependent) |
| Travelling speed: | max. 90 m/min |