Customised System solutions

Overhead monorail for tractor radiator assembly


 

customer: John Deere, Mannheim

Tractors for the German and international market are built in the Mannheim factory of American agricultural machinery manufacturer, John Deere. Approx. 2600 staff work here at the second largest location in the world of the US specialist from Moline, Illinois. Over 200 tractors leave the line every day in one of the most modern tractor factories in Europe.


The Solutions in detail:

 

 
 

Project data  
Type of installation: circular runway in special KT2000 profile
Length of runway: 93 m with maintenance spur
Trolleys: 8 monorail trolleys, each 250 kg S.W.L.
Hoists: STD 1005-8/2 2/2-2E dual chain hoists
Power supply: eight-pole conductor line integrated into system
Equipment: radio remote control with redundant infrared signal, travel speed synchronised with assembly line, chain hoist at right-angles to runway, can be moved on special skid


 

Information material

Reference brochures

01. Europe’s largest storage and
retrieval machine –

Lütkenhaus, Dülmen
(2 pages)

  [PDF, 494 KB]
02. Coil handling crane in the paper industry

SAPPI Alfeld AG, Alfeld
(2 pages)

  [PDF, 965 KB]
03. Chain hoists with 110 m height of lift
for wind power stations –

REpower, Husum
(2 pages)

  [PDF, 462 KB]
04. Three 51 m cranes in the railway
construction –

Stadler Rail AG, Switzerland
(2 pages)

  [PDF, 404 KB]
05. Modernisation of three suspension cranes in a hangar –

SR Technics Switzerland
(2 pages)

  [PDF, 1.08 MB]
06. Off-standard hoist for power station

Elsam Kraft A/S, Esbjerg/Denmark
(2 pages)

  [PDF, 305 KB]
07. Overhead monorail for tractor radiator
assembly –

John Deere, Mannheim
(2 pages)

  [PDF, 377 KB]
08. Five heavy duty cranes
in engine production –

BMW, Landshut
(2 pages)

  [PDF, 296 KB]
09. Automatic crane for organic substances heating and power station –

Pfaffenhofen
(2 pages)

  [PDF, 455 KB]
10. Handling paper reels in five dimensions

Stora Enso, Wolfsheck/Germany
(2 pages)

  [PDF, 446 KB]
11. Three suspension cranes with off-standard suspensions

(2 pages)

  [PDF, 338 KB]
12. Automatic crane for waste reloading

Waste reloading station, Wörth
(2 pages)

  [PDF, 384 KB]
13. Modification of listed cranes

Georg Friedrich Barracks, Fritzlar
(2 pages)

  [PDF, 430 KB]
14. Modernisation of blasting cabin

Georg Funk Iron Foundry, Aalen/Germany
(2 pages)

  [PDF, 361 KB]
15. Extra Short Headroom Trolley for Plastics Moulding Shop

Kärcher, Bühlertann
(2 pages)

  [PDF, 363 KB]
16. 35 t Twin Drive Crane for Smelting Plant

Norddeutsche Affinerie AG, Hamburg
(2 pages)

  [PDF, 187 KB]